UltraFloor helps Showcase a Legendary Brand in Gateshead

Aiken Flooring Contractors have completed subfloor preparation using UltraFloor materials on a Harley Davidson showroom project in Gateshead.

The project was secured by CFA member, Aiken Flooring Contracts who worked to a tight deadline and finished the showroom floor in only 4 weeks. The work included floor prep, priming, damp proofing, bulking out and levelling prior to floor covering application. The UltraFloor range of materials were chosen due to their reliable performance and helped to secure a successful and cost-effective project.

UltraFloor Multi-surface Primer was used to prior to the application of the damp proof membrane and leveller. This popular primer is suitable for porous and non-porous substrates, enhancing adhesion and reducing pinholing for a bond-proof installation.

Rapid curing primer membrane, DPM IT is designed to provide protection against subfloor moisture. Boasting a 98%RH floor moisture tolerance the two-part epoxy resin system cures in 5 hours.

High flow, two-component smoothing underlayment Level IT Two can be applied at depths between 2mm and 12mm. For deeper sections up to a maximum or 30mm, as required in the showroom, a graded aggregate filler can be used to bulk out prior to levelling. Low odour and protein free, Level IT Two can be overlaid after 12 hours with bonded floor coverings.

For further product information including the datasheet, please click here or to place an order call +44 (0) 1827 254402. Keep up-to-date with the latest news, competitions and much more from UltraFloor on Twitter follow @Ultra_Floor.