It’s a Scouts Honour for UltraFloor at their latest installation

M2 Flooring have used UltraFloor’s latest flooring innovation – Level IT Hydra Bond – to install a new floor at a Scout Hall in Newport.

Background

Torfaen based contractors, M2 Flooring have secured the contract to install a 200sqm new floor in the Sea Cadets and Scout Hall in Newport, Wales.

The Challenge

The project involved stripping back full vinyl tiles and taking a copper disk to the whole subfloor to reveal the original concrete substrate.

The Solution

UltraFloor and M2 Flooring have partnered regularly on several projects with UltraFloor products delivering complete confidence and assurance every time.

Familiar with the outstanding performance of UltraFloor materials, M2 Flooring were confident they would get the job done with ease.

To begin, the entire area was primed with Prime IT Multi-surface Primer, and once cured, Level IT Hydra Bond was trowel applied at a 3mm depth.

Level IT Hydra Bond is a ground-breaking, water based floor leveller that can be applied to bitumen and adhesive residues. Formulated for use in highly trafficked areas, Level IT Hydra Bond is guaranteed to have a super smooth finish and is easy to apply – ideal for creating a lump-free subfloor, eliminating dangerous trip hazards for adults, children and young adults using the Sea Cadet and Scout Hall.

What’s more, Level IT Hydra Bond utilises UltraFloor’s unique EnviroBead technology – a process which enhances application and boasts unrivalled flow properties.

Level IT Hydra Bond can receive bonded floor coverings after just 4 hours, so in no time at all, M2 Flooring were able to install Forbo Sure Step flooring and finish the job.

Results

Thanks to M2 Flooring’s expert skills and UltraFloor’s superb subfloor preparation materials, the Sea Cadets and Scouts are now enjoying their brand new facilities.

To find out more about UltraFloor please contact their team of flooring experts by emailing ultrafloor@instarmac.co.uk or calling +44 (0) 1827 254402.

Products used

Prime IT Multi-surface Primer

View Product

Level IT Hydra Bond

View Product

Chris Hollingshead

“UltraCrete’s Kerb & Patch Repair is a quick and efficient solution enabling us to carry out repairs to kerbs instead of replacing them. This has saved us time and money.”

Worcestershire County Council

Connect with the Instarmac community

#Instarmac

Latest News

UltraTile wins ‘Excellence in Marketing’ at TTA Awards

Celebrations are aplenty at UltraTile as they are presented with ‘Excellence in Marketing’ at th...

Read more

UltraCrete helps improve world-famous Tower Bridge

Trusted manufacturers of ductile access covers, Eccles, and infrastructure services partner, FM Conw...

Read more

Head Office

Danny Morson Way
Birch Coppice Business Park
Dordon, Tamworth B78 1SE

UK Tel: +44 (0) 1827 254 400

Scotland & Ireland Office

Suite 1 E/F Liberty House
15 Cromarty Campus
Rosyth, Fife KY11 2YB

Scottish Tel: +44 (0) 141 260 9051
Irish Tel: +44 (0) 141 260 9053