UltraFloor are delighted to have provided Specialist Screed (Flooring) Solutions with expert subfloor preparation materials to complete a 2,000sqm flooring project at DHM Plastics in Kent.

Background

Specialist Screed (Flooring) Solutions are known nationally for their floor zone expertise within the commercial, industrial and domestic sectors. Their extensive knowledge and experience put them in perfect place to install 2,000sqm of Vebro EP Epoxy High Build Coating System at DHM Plastic’s warehouse in Lenham, Kent.

The Challenge

The biggest challenge facing this project was the tight timescale Specialist Screed (Flooring) Solutions had to work to. The clients needed the project to be completed during their Christmas shutdown which meant there was only 10 days to complete the work before the machinery needed to be moved back in.

The Solution

After securing the project, Steve Fincham, Head of Specialist Projects, sought professional advice from UltraFloor’s Area Sales Manager for the South, Crystal Hopkins.

After visiting site, Crystal recommended the use of Prime IT Multi-surface Primer and Level IT Top – expert subfloor preparation materials that would meet the clients’ requirements perfectly.

Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200m² at 3:1 dilution, Prime IT multi-surface Primer is a must-have product for all flooring installation projects.

Level IT Top is a polymer rich, high strength, single part, cementitious smoothing underlayment which incorporates recycled raw materials. Formulated for exceptional abrasion resistance, Level IT Top has been designed for use a finished wear surface in both industrial and commercial applications.

Mixed easily on-site with water, Level IT Top can be trowel or pump applied and is suitable for use in heavily trafficked areas such as warehouses, storage areas, corridors and factory units.

What’s more, Level IT Top has a working time of 30-40 minutes, can receive foot traffic after 2-3 hours and forklift traffic after as little as 36 hours – perfect for projects with a quick turnaround such as this one.

The Results

“We, and the client, were impressed with the smooth finish and robustness of the finished project.” Steve Fincham, Head of Specialist Projects at Specialist Screed (Flooring) Solutions.

For more information about UltraFloor and their range of subfloor preparation materials, please contact their team of flooring experts by calling +44 (0) 1827 254402, emailing ultrafloor@instarmac.co.uk or visiting ultra-floor.co.uk.

“The UltraTile Pro Level Ultimate was incredible easy to work with and the ProFlex SP adhesive was great too (even for a beginner like me!).”

Lee Aylott

Connect with the Instarmac community

#Instarmac

Latest News

UltraCrete enables Underground Utility Specialist to expand their business operations

Supported by UltraCrete’s customer care team and their market-leading highway maintenance material...

Read more

UltraCrete transforms customer challenges into success

Boasting over 20 years’ experience delivering essential infrastructure services, a leading utility...

Read more